Hillside Residences 3 construction photos
22 photos from 6 site inspections, newest first. The percentage is how much of Hillside Residences 3 was built on the day of each visit.
5 October 202613% built
4 May 20265.5% built
14 November 20252.6% built
2 April 20252.6% built
29 May 20240% built
11 October 20230% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.











.jpeg&w=3840&q=75)