Skip to content

A small team in Dubai, building one app for property owners.

Mulki is pre-launch and hires slowly.

Open roles
None listed. We hire by meeting people.
Based in
Dubai, United Arab Emirates.
Stage
Pre-launch, and deliberately small.

What working here is like.

  • A small team, before launch.

    The work you do is in the app the day it ships, and there are few meetings between the two.

  • The owner is the customer.

    The product answers to the person on the title deed, which rules out ads, lead sales and most of the usual growth tactics.

  • Plain English, in the app and in the office.

    We turn down features that need a louder voice to sell, and spend the time making the existing ones work.

  • Government systems, with real consequences.

    We work with the Dubai Land Department, Mollak and UAE PASS. A wrong figure is one an owner might act on, so accuracy is checked before anything ships.

White arches and bougainvillea along the arcade of a 1980s Dubai villa that a design studio works from

The work itself.

Mulki reads the Dubai property record and gives it back to the person whose name is on it. Deeds, Ejari contracts, Mollak charges and Land Department transactions are four systems, and each names the same building differently.

Most of the engineering is reconciliation, and refusing to show a number we cannot stand behind.

A long warehouse wall with two red doors on an Al Quoz street, Dubai

The design side.

Property software defaults to dashboards that flatter the holder. Ours has to tell someone their unit is underperforming and be believed while doing it.

The guides and the sell-or-hold framework are written to that standard, and so is every screen we ship.

Who does well here

  • You hold yourself to the detail nobody else will notice.

  • You can sit with a vague brief and return with a specific answer.

  • You write the way you speak, and you speak plainly.

  • You know Dubai as a place to live, and want to understand it better.

Concrete, OMA's translucent hall at Alserkal Avenue, seen across its courtyard, Al Quoz

There are no open listings. Write anyway.

Write to us

careers@mulki.ae. Send your CV and a few lines on what you would build here if it were yours to build. A founder reads every email and replies.