Bellavion By Sunrise construction photos
19 photos from 4 site inspections, newest first. The percentage is how much of Bellavion By Sunrise was built on the day of each visit.
12 November 202619% built
8 June 202610% built
17 February 20262.8% built
6 January 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.













.jpeg&w=3840&q=75)

.jpeg&w=3840&q=75)

.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)