Burj Azizi construction photos
7 photos from 2 site inspections, newest first. The percentage is how much of Burj Azizi was built on the day of each visit.
3 September 20267.5% built
27 August 20240.5% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.






