Topaz Residences 2 construction photos
45 photos from 6 site inspections, newest first. The percentage is how much of Topaz Residences 2 was built on the day of each visit.
21 April 2024100% built
22 September 202374% built
31 October 202255% built
14 March 201852% built
11 October 201751% built
3 May 201750% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.