Platinum Residence 1 construction photos
20 photos from 3 site inspections, newest first. The percentage is how much of Platinum Residence 1 was built on the day of each visit.
5 December 2016100% built
7 September 201692% built
16 September 201571% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.
