The Alba Residences By Omniyat construction photos
25 photos from 5 site inspections, newest first. The percentage is how much of The Alba Residences By Omniyat was built on the day of each visit.
1 September 20268.3% built
10 March 20267.0% built
30 October 20255.4% built
15 July 20251.8% built
3 July 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.