Wynwood Residences By Imtiaz construction photos
31 photos from 6 site inspections, newest first. The percentage is how much of Wynwood Residences By Imtiaz was built on the day of each visit.
6 October 202626% built
9 July 202616% built
3 April 20268.4% built
24 December 20255.4% built
9 September 20250.7% built
20 May 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.