Silena Residences construction photos
21 photos from 5 site inspections, newest first. The percentage is how much of Silena Residences was built on the day of each visit.
3 November 20265.7% built
31 July 20263.8% built
1 May 20261.6% built
29 January 20260% built
24 June 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.