Meriden Beach By Green Horizon construction photos
13 photos from 3 site inspections, newest first. The percentage is how much of Meriden Beach By Green Horizon was built on the day of each visit.
2 November 20267.8% built
29 April 20261.4% built
26 August 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.






.jpeg&w=3840&q=75)

.jpeg&w=3840&q=75)



