Skip to content

Floarea Breeze construction photos

7 photos from 2 site inspections, newest first. The percentage is how much of Floarea Breeze was built on the day of each visit.

26 October 20263.8% built

2 September 20250% built

Back to Floarea Breeze construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.