Elle Residences construction photos
6 photos from 2 site inspections, newest first. The percentage is how much of Elle Residences was built on the day of each visit.
7 May 20260% built
4 September 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.
.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)

