Dreamlife Residences construction photos
19 photos from 3 site inspections, newest first. The percentage is how much of Dreamlife Residences was built on the day of each visit.
3 September 202631% built
29 April 202621% built
23 April 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.















