Capital Horizon Terraces construction photos
8 photos from 2 site inspections, newest first. The percentage is how much of Capital Horizon Terraces was built on the day of each visit.
15 September 20264.4% built
4 December 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.
.jpeg&w=3840&q=75)

.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)

.jpeg&w=3840&q=75)

