Beach Walk Residences 4 By Imtiaz construction photos
36 photos taken by Dubai Land Department engineers at 6 site inspections, newest first. The percentage is how much of Beach Walk Residences 4 By Imtiaz was built on the day of each visit.
13 August 202643% built
1 June 202634% built
26 February 202617% built
22 October 20254.6% built
18 July 20253.7% built
21 April 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.