Beach Walk Residences 4 By Imtiaz construction photos

45 photos from 7 site inspections, newest first. The percentage is how much of Beach Walk Residences 4 By Imtiaz was built on the day of each visit.

5 November 202654% built

13 August 202643% built

1 June 202634% built

26 February 202617% built

22 October 20254.6% built

18 July 20253.7% built

21 April 20250% built

Back to Beach Walk Residences 4 By Imtiaz construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.