Beach Walk Grand 2 By Imtiaz construction photos
28 photos from 6 site inspections, newest first. The percentage is how much of Beach Walk Grand 2 By Imtiaz was built on the day of each visit.
14 September 202624% built
23 June 202617% built
23 March 20268.4% built
23 December 20255.3% built
4 September 20250.2% built
1 May 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.