Woodland Terraces construction photos
13 photos from 4 site inspections, newest first. The percentage is how much of Woodland Terraces was built on the day of each visit.
2 September 202610% built
26 March 20264.3% built
22 October 20251.1% built
26 December 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.





.jpeg&w=3840&q=75)






