Tulip Oasis 11 construction photos

51 photos from 6 site inspections, newest first. The percentage is how much of Tulip Oasis 11 was built on the day of each visit.

13 October 202693% built

6 July 202670% built

2 April 202663% built

22 December 202550% built

15 September 202546% built

6 February 202530% built

Back to Tulip Oasis 11 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.