Sherena Residence 2 construction photos

59 photos taken by Dubai Land Department engineers at 7 site inspections, newest first. The percentage is how much of Sherena Residence 2 was built on the day of each visit.

22 April 202682% built

26 December 202576% built

15 February 202451% built

17 August 202347% built

6 February 202339% built

2 March 202127% built

5 May 201922% built

Back to Sherena Residence 2 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.