68 photos taken by Dubai Land Department engineers at 7 site inspections, newest first. The percentage is how much of Sonate Residences By Condor was built on the day of each visit.

4 September 202666% built

10 July 202658% built

27 April 202641% built

19 December 202531% built

19 June 202517% built

14 January 202513% built

24 January 20240% built

Back to Sonate Residences By Condor construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.