Tetris Tower construction photos

11 photos taken by Dubai Land Department engineers at 3 site inspections, newest first. The percentage is how much of Tetris Tower was built on the day of each visit.

30 July 20268.1% built

26 March 20266.6% built

3 April 20250% built

Back to Tetris Tower construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.