Shamal Terraces 4 construction photos
12 photos from 3 site inspections, newest first. The percentage is how much of Shamal Terraces 4 was built on the day of each visit.
24 August 2016100% built
1 October 201560% built
31 December 20147.3% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.

