Samha Residence 2 construction photos

38 photos taken by Dubai Land Department engineers at 4 site inspections, newest first. The percentage is how much of Samha Residence 2 was built on the day of each visit.

14 August 202652% built

25 March 202635% built

17 December 202527% built

11 June 202515% built

Back to Samha Residence 2 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.