Park Boulevard By Meteora construction photos

15 photos from 3 site inspections, newest first. The percentage is how much of Park Boulevard By Meteora was built on the day of each visit.

10 March 202630% built

25 March 202518% built

2 May 20247.5% built

Back to Park Boulevard By Meteora construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.