16 photos taken by Dubai Land Department engineers at 5 site inspections, newest first. The percentage is how much of Norah Residence was built on the day of each visit.

29 September 20266.8% built

2 July 20266.0% built

30 March 20265.1% built

11 December 20250.1% built

14 May 20250% built

Back to Norah Residence construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.