Casa Vista Residence By Golden Woods construction photos
29 photos from 4 site inspections, newest first. The percentage is how much of Casa Vista Residence By Golden Woods was built on the day of each visit.
9 June 202690% built
27 October 202578% built
28 April 202548% built
11 March 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.