Astoria Residnece construction photos

60 photos from 6 site inspections, newest first. The percentage is how much of Astoria Residnece was built on the day of each visit.

21 March 2017100% built

4 October 201699% built

6 October 201599% built

22 June 201473% built

27 January 201472% built

29 April 201361% built

Back to Astoria Residnece construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.