Ab Cavalier construction photos

50 photos from 5 site inspections, newest first. The percentage is how much of Ab Cavalier was built on the day of each visit.

21 April 2026100% built

12 December 202597% built

27 August 202593% built

27 March 202575% built

12 September 20234.1% built

Back to Ab Cavalier construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.