Ab Cavalier construction photos
50 photos from 5 site inspections, newest first. The percentage is how much of Ab Cavalier was built on the day of each visit.
21 April 2026100% built
12 December 202597% built
27 August 202593% built
27 March 202575% built
12 September 20234.1% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.