Skip to content

77 Boulevard By Bam construction photos

8 photos from 2 site inspections, newest first. The percentage is how much of 77 Boulevard By Bam was built on the day of each visit.

24 March 202618% built

9 January 20250% built

Back to 77 Boulevard By Bam construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.