105 Residences By Kamdar construction photos
23 photos from 6 site inspections, newest first. The percentage is how much of 105 Residences By Kamdar was built on the day of each visit.
15 October 202612% built
13 July 202610% built
2 April 20263.6% built
11 December 20251.6% built
11 July 20250.3% built
1 October 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.