Me Do Re 2 construction photos
28 photos from 4 site inspections, newest first. The percentage is how much of Me Do Re 2 was built on the day of each visit.
28 October 202698% built
9 March 202698% built
20 May 202595% built
1 May 202481% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.