Purvanchal Triana Residences construction photos

46 photos from 5 site inspections, newest first. The percentage is how much of Purvanchal Triana Residences was built on the day of each visit.

20 November 202636% built

3 August 202626% built

30 April 202615% built

30 December 202511% built

24 September 20250% built

Back to Purvanchal Triana Residences construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.