Evergrin House 2 construction photos
12 photos from 3 site inspections, newest first. The percentage is how much of Evergrin House 2 was built on the day of each visit.
21 July 202610% built
14 April 20263.9% built
25 September 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.











