Samana Lake Views 2 construction photos
29 photos from 7 site inspections, newest first. The percentage is how much of Samana Lake Views 2 was built on the day of each visit.
28 October 202612% built
10 June 20268.9% built
5 February 20267.5% built
3 November 20254.1% built
2 July 20253.8% built
29 January 20250.3% built
8 May 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.