Lakeside construction photos
43 photos from 4 site inspections, newest first. The percentage is how much of Lakeside was built on the day of each visit.
14 July 201490% built
5 March 201485% built
10 October 201376% built
6 February 201365% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.













