Imperial Residence construction photos
23 photos from 5 site inspections, newest first. The percentage is how much of Imperial Residence was built on the day of each visit.
5 January 202643% built
2 June 202521% built
17 February 202514% built
23 January 202512% built
7 October 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.








