The Edit At D3 construction photos
8 photos from 3 site inspections, newest first. The percentage is how much of The Edit At D3 was built on the day of each visit.
19 August 20260.2% built
1 June 20260% built
29 October 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.
.jpeg&w=3840&q=75)

.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)