Skip to content

Serra Residence By Wujod construction photos

12 photos from 2 site inspections, newest first. The percentage is how much of Serra Residence By Wujod was built on the day of each visit.

30 September 202629% built

16 January 20260% built

Back to Serra Residence By Wujod construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.