Skip to content

Golf Terrace Residences By Asak construction photos

8 photos from 2 site inspections, newest first. The percentage is how much of Golf Terrace Residences By Asak was built on the day of each visit.

7 May 20265.1% built

22 December 20250% built

Back to Golf Terrace Residences By Asak construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.