Al Ezz Tower By Abualnaga construction photos
6 photos from 2 site inspections, newest first. The percentage is how much of Al Ezz Tower By Abualnaga was built on the day of each visit.
3 November 20263.2% built
14 September 20261.7% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.
.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)



