Waada - Altura 2 construction photos

8 photos from 3 site inspections, newest first. The percentage is how much of Waada - Altura 2 was built on the day of each visit.

20 October 20267.2% built

13 April 20264.1% built

25 September 20250% built

Back to Waada - Altura 2 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.