Verde By Vision construction photos
9 photos from 3 site inspections, newest first. The percentage is how much of Verde By Vision was built on the day of each visit.
12 October 202612% built
14 April 20261.6% built
24 September 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.
.jpeg&w=3840&q=75)



