Orchid Residence 1 construction photos
15 photos from 2 site inspections, newest first. The percentage is how much of Orchid Residence 1 was built on the day of each visit.
19 May 202648% built
17 October 202537% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.