Livia Residence construction photos
23 photos from 5 site inspections, newest first. The percentage is how much of Livia Residence was built on the day of each visit.
10 November 202623% built
30 July 202615% built
23 April 20269.3% built
27 January 20261.4% built
16 April 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.














.jpeg&w=3840&q=75)



