Skip to content

Lincoln Star Residence construction photos

36 photos from 5 site inspections, newest first. The percentage is how much of Lincoln Star Residence was built on the day of each visit.

27 October 202655% built

26 February 202647% built

6 October 202531% built

21 April 202517% built

28 May 20240% built

Back to Lincoln Star Residence construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.