Bhuvi Residence construction photos
11 photos from 3 site inspections, newest first. The percentage is how much of Bhuvi Residence was built on the day of each visit.
6 August 202632% built
27 October 202521% built
10 February 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.


.jpeg&w=3840&q=75)


.jpeg&w=3840&q=75)

.jpeg&w=3840&q=75)


