Skip to content

Altair 52 construction photos

12 photos from 3 site inspections, newest first. The percentage is how much of Altair 52 was built on the day of each visit.

24 September 202610% built

27 March 20262.3% built

10 June 20250% built

Back to Altair 52 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.