Aria By Beyond construction photos
66 photos from 8 site inspections, newest first. The percentage is how much of Aria By Beyond was built on the day of each visit.
30 September 202685% built
3 July 202674% built
25 March 202665% built
23 December 202552% built
30 August 202540% built
28 May 202530% built
7 January 202516% built
25 July 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.