Verdania 1 construction photos
16 photos taken by Dubai Land Department engineers at 4 site inspections, newest first. The percentage is how much of Verdania 1 was built on the day of each visit.
18 June 202617% built
24 February 202612% built
28 July 20253.0% built
26 May 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.
.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)


.jpeg&w=3840&q=75)








