Terra Tower construction photos
14 photos from 4 site inspections, newest first. The percentage is how much of Terra Tower was built on the day of each visit.
8 July 20267.4% built
2 March 20266.8% built
31 October 20252.7% built
12 September 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.





.jpeg&w=3840&q=75)



